{"id":227,"date":"2014-02-10T16:50:00","date_gmt":"2014-02-10T16:50:00","guid":{"rendered":"http:\/\/library.brown.edu\/hayrenovation\/?p=227"},"modified":"2014-02-10T16:50:00","modified_gmt":"2014-02-10T16:50:00","slug":"hay-renovation-project-right-on-schedule","status":"publish","type":"post","link":"https:\/\/library.brown.edu\/create\/hayrenovation\/2014\/02\/10\/hay-renovation-project-right-on-schedule\/","title":{"rendered":"Hay Renovation Project Right on Schedule"},"content":{"rendered":"<p>As of early February 2014 the John Hay Library renovation project is right on schedule.\u00a0 The four images below provide a snapshot of the progress being made during the project&#8217;s construction phase.\u00a0 The first image shows the construction of the new accessible restrooms on the first floor of the library, the entrance to which is adjacent to the Reader Services desk and right inside the new Exhibition Gallery.\u00a0 The second image provides a look at the new entrance to the Reader Services area (view is from the Reader Services desk toward the lobby and the front entrance to the building).\u00a0 One can see the new first-floor Consultation\/Meeting Room taking shape in the third image and the refurbished third-floor skylight in the fourth image.\u00a0 Stay tuned for further progress reports.<\/p>\n<p><a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/image.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-229\" alt=\"image\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/image.png\" width=\"286\" height=\"174\" \/><\/a><a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/New-entrance-into-Reader-Services.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-231\" alt=\"New entrance into Reader Services\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/New-entrance-into-Reader-Services.png\" width=\"300\" height=\"225\" \/><\/a> <a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/new-consultation-room.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-230\" alt=\"new consultation room\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/new-consultation-room.png\" width=\"270\" height=\"202\" \/><\/a>\u00a0 <a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/Refurbished-skylight.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-232\" alt=\"Refurbished skylight\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/02\/Refurbished-skylight.png\" width=\"270\" height=\"178\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As of early February 2014 the John Hay Library renovation project is right on schedule.\u00a0 The four images below provide a snapshot of the progress being made during the project&#8217;s construction phase.\u00a0 The first image shows the construction of the new accessible restrooms on the first floor of the library, the entrance to which is [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-227","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/posts\/227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/comments?post=227"}],"version-history":[{"count":0,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/posts\/227\/revisions"}],"wp:attachment":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/media?parent=227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/categories?post=227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/tags?post=227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}