{"id":242,"date":"2014-04-09T17:36:58","date_gmt":"2014-04-09T17:36:58","guid":{"rendered":"http:\/\/library.brown.edu\/hayrenovation\/?p=242"},"modified":"2014-04-09T17:36:58","modified_gmt":"2014-04-09T17:36:58","slug":"hay-renovation-update-new-windows","status":"publish","type":"post","link":"https:\/\/library.brown.edu\/create\/hayrenovation\/2014\/04\/09\/hay-renovation-update-new-windows\/","title":{"rendered":"Hay Renovation Update:  New Windows"},"content":{"rendered":"<p>The John Hay Library renovation project remains on schedule.\u00a0 The current plan calls for the staff to move back into the Hay in mid-June and the building to open for business in the fall.\u00a0 The latest sign of progress is the installation of new windows on the first floor, including the main reading room, the special collections reading room, and the Bruhn Room.\u00a0 The first two images show windows being installed in the main reading room (exterior and interior views) on the south side of the building.\u00a0 The final two images show the new windows in the special collections reading room (interior and exterior views) on the north side of the building.\u00a0 Stay tuned for the next update.<\/p>\n<p><a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/jhwindows4.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-245\" alt=\"jhwindows4\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/jhwindows4.png\" width=\"254\" height=\"380\" \/> \u00a0<\/a><a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/JH-windows-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-243\" alt=\"JH windows 1\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/JH-windows-1.jpg\" width=\"288\" height=\"216\" \/><\/a><\/p>\n<p><a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/jhwindows5.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-247\" alt=\"jhwindows5\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/jhwindows5.png\" width=\"313\" height=\"456\" \/><\/a>\u00a0 <a href=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/jhwindows6.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-248\" alt=\"jhwindows6\" src=\"http:\/\/library.brown.edu\/create\/hayrenovation\/wp-content\/uploads\/sites\/10\/2014\/04\/jhwindows6.png\" width=\"272\" height=\"470\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The John Hay Library renovation project remains on schedule.\u00a0 The current plan calls for the staff to move back into the Hay in mid-June and the building to open for business in the fall.\u00a0 The latest sign of progress is the installation of new windows on the first floor, including the main reading room, the [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-242","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/posts\/242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/comments?post=242"}],"version-history":[{"count":0,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/posts\/242\/revisions"}],"wp:attachment":[{"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/media?parent=242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/categories?post=242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/library.brown.edu\/create\/hayrenovation\/wp-json\/wp\/v2\/tags?post=242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}